Scaffold Finance Get a 4-hour decision

Home › Guides › Progress Claims and Retention

Progress Claims and Retention: Why Scaffolders Wait 60 Days and What to Do About It

You've got crews on three sites, the work is getting done, and the books say it's a good month. Then wages, hire costs and the BAS land, and the account is thin. Nothing is wrong with the work. The money is stuck in the gap between doing the job and getting paid for it.

That gap is the heart of scaffolding progress claims cash flow. This article walks through how the timeline works and where the cash gets trapped. It also covers which tool fits which part of the gap. For the detail on selling invoices, we've got a separate guide, so we won't repeat it here.

The timeline: from erect to cash in the bank

Here's what a typical progress-claim job looks like in practice, with your costs running the whole way through:

  1. Site establishment. You buy or hire in gear, pay for transport, and put wages on the job before you've claimed anything.
  2. Erect. The crews build, you submit a progress claim for the work done so far, and wages keep rolling every week.
  3. Certification. The builder or head contractor reviews your claim. Some tick it quickly. Others query line items, and the clock stalls.
  4. Payment terms. Once the claim is accepted, the contract's payment terms start counting. That period can run well past the date you issued the claim.
  5. Retention. A portion of what you've earned is held back until a later milestone, such as practical completion or the end of a defects period.
  6. Strip. You dismantle, and the final claim goes in. Often the last stretch of money is the slowest.

Add those stages up and "wait 60 days" is often optimistic. The wages for the first week of the job might not be covered by incoming cash until two months later.

Why the books say profit but the account says otherwise

Accounting records the work when you claim it. Your bank account only moves when somebody pays. In between, you've got what's called a timing gap, and it's the reason a profitable scaffolder can be short of cash.

What we see in deals is that three things stack on top of each other:

It also helps to separate a timing problem from a profit problem. If margins are thin, finance won't fix that. If margins are fine and the cash arrives late, you have a gap that can be bridged.

Retention: the slow money

Retention is a percentage held back from your payments as security for the contract. It's normal, and it's usually in your contract terms. The pain is that you've done the work and covered the cost, but the money sits with someone else.

A few practical points from the field:

Field note: Before you quote, map the cash out and the cash in by week for the first 12 weeks. If the lowest point on that map is more than your account can carry, you've found the gap before it finds you. Price it in, negotiate terms, or line up funding first.

Which tool covers which part of the gap

People often lump everything under one heading, but the tools solve different stretches of the timeline. Lenders look at each differently, and what suits you depends on your debtors, your gear and your contracts.

Waiting on certified claims

This is the stretch between issuing the claim and being paid. Debtor-based funding is designed for it, because it's tied to what customers owe you. Our guide to scaffolding debtor finance covers how it works, and the invoice finance scaffolding page explains how it fits a scaffolding business. Whether it suits you depends on your contracts and how lenders assess your debtors. Retention is often treated differently from standard claims, so ask how it's handled.

Putting gear on before the first claim

Upfront costs for ringlock, kwikstage, a tray truck or a crane truck are a different problem. Spreading the cost of the asset over its working life through scaffolding equipment finance keeps cash in the account for wages. The equipment itself usually forms the security, so it doesn't need to lean on your debtor book. Our overview on the wet hire vs dry hire page is worth a read if you're deciding between buying and hiring in labour or gear.

General working capital

A broader facility can smooth lumpy months. Our scaffolding business loans guide covers what lenders typically consider.

The short version: debtor funding eases the wait for payment, equipment funding eases the cost of gear, and neither makes retention disappear. Different lenders have different appetites for each.

Three things scaffolders get wrong

  1. Funding the wrong problem. Using a gear facility to cover wages, or chasing debtor funding when the real issue is an oversized truck purchase. Match the tool to the gap.
  2. Ignoring the claim process. Late, messy or incomplete claims add days of delay on their own. Clean paperwork is free cash flow.
  3. Leaving it until the account is empty. Lenders usually look at your history, your debtors and your trading position. It's far easier to talk about it when you're steady than when you're stretched.

Practical steps to tighten the gap

Having a clear picture of scaffolding progress claims cash flow makes every one of these conversations easier, with a lender or a head contractor.

Checklist before your next big job

If you'd like to talk through where your gap sits, get in touch and we'll go through your situation. We've spent 13 years on the tools and in the yard, so we know what a progress-claim month looks like.

This is general information only and isn't credit or personal advice. It doesn't take your objectives or circumstances into account, so consider whether it suits you, and get advice on your own situation before you apply.

Ready to move?
Approval decision in as little as 4 hours — from a broker with 13 years in scaffolding.

Call 1300 968 888 →